top of page

Innovation

We have wide experience of innovation across the spectrum of activity, this includes:

  • Early adopter – first use of roll out reinforcement in UK, first use of high rise climbing screens in UK, first use of EFC in permanent works in UK.

  • Identifying need for innovation – what can we do better, how can we do it better?

  • Inventive activity around innovation – how do we develop the brief, how do we source the development or do we self deliver?

  • Prototyping and production development – how do we go from idea to something we can test and develop?

  • Independent review – how do we demonstrate the compliance of the innovation?

  • Intellectual property – patents and trademarks, and protecting the ideas

​

Case study – duct ovalisation measurement - “Squashometer”

On a battery energy storage scheme, the final depth of road construction and chippings was to be left off until close to completion to enable large plant (300t crawler cranes) to install the electrical equipment. A concern was raised about the effect of large surcharges on ducts buried with shallow cover. We couldn’t find anything useful in the literature and so decided to measure the effect.

We designed and built a device that used non-contact distance sensors (time of flight lasers) to measure ovalising of the ducts. We also had to check the device was correctly aligned as the measurement was taking place some 6m into the duct to avoid end effects of the partial backfill. The length of the skids gave us axial alignment with the duct and there was an accelerometer to check how aligned the lasers were with the vertical and horizontal axes.

We simulated driving and operating the crane over the duct and data-logged the timestamped readings from the loading equipment, (hydraulic plate load testing with surface deflection measurement) and the readings from our device. There was a clear correlation, but within sensible levels, and very good recovery on unloading. Repeated loading cycles didn’t show any incremental change.

Prototype of device to measure duct ovalisation under plant loadings